| CONSTRUCTION
METHOD TERRACING
- Digging in trench in all kind of ground, included the extraction and
collect of spoil earth to public dump.
- Makeover of the outside land and setting out of green spaces and parking
area in accordance with joined plan.
- Supporting walls, finishing exposed stones.
- Connections to different local networks ( main sewer, water....). see
plan of situation.
MASONRY - REINFORCED CONCRETE - COAT
- Digging in trenchs, pouring of foundations in reinforced concrete.
- Setting up the buried under ground walls with reinforced concrete and
the finishing will be made up of stones (thickness 18 cm).
- Creation of floors in insulating material ( thickness 20cm) with soundproofing
properties.
- Raisng of dividing walls in reinforced concrete.
- Wooden weatherboarding on the facade.
- Shelves and doorsteps will be executed with cement rendering or wood
in a sloping shape, according to the plan of facade.
- Lay on of insulating material underneeth the wooden weatherboarding.
FRAMEWORK-ROOFING-ZINC OVER
Framework composed of :
- Beams and rafter in soaked pine wood composed of:
- Wooden crosspieces.
- Watertight aluminium fixed on a double roofing separated
by rafters.
- Grey painted iron roof covering planks area.
WHEATHERBOARDING
- Protective watertightness fixed on all buried external walls.
- Protective watertightness fixed on the garage roof.
INTERIOR JOINERY
- Pine wood or similar wood used for inside doors and frames and for covering
hinges.
- Pine wood or similar wood used for cupboard doors, redy to be varnished.
- Wooden door with safety lock opening into the coridor; finshignin pine
wood on the outside.
- Cupboard in pine wood , redy to be varnished.
- hardware composed of plates and hinge sfor the door.
- Inside bedrooms: skirting board put up on dividing walls.
- Heat-resistant wooden boards fixed on the outside walls.
- Heat-resistant wooden planks fixed on the outside walls.
- Decorative wooden pine boarder in the living room, put up between walls
and ceiling.
EXTERNAL JOINERY
- Traditional wooden pine used for doors of balconies, windows and windowframes.
- Vertical pinewood strips used for balustrades and handrails of balconies.
- On the ground floor level , putting up of 1 leaf shutter or folding
shutters on doors and small windows.
PLASTERWORKS
The inside dividing walls will be made with plaster slabs ( thickness
6 cm). It will be waterproof in the bathroom.
INSIDE PAINTING
- Hue on all wooden pieces , as well as frames and doors (color : “courcheneige”
or similar).
- Rustic roughcast layed on every walls as the store cupboard and lavatory.
EXTERNAL PAINTING
- All outside wooden parts soaked with painting as well as : externam
frameworks, shingle walls and balconies.
- Brushed roughcast layed on walls.
- The outside joineries and shingle walls, will be soaked t(wo times with
speciality satin-finished goods.
ELECTRICITY
- Private installation for each apprtment with individual safety fuse
board and individual cut out.
- The whole electric installation will be set in plastic pipe from the
cut-out board to the lamp socket.
- All electric fittings will be “Chambord” of legrand or similar.
BRIEF SUM UP
- Electrical outputs set into the living roomù, bedrooms and
sanitaries.
- Control by simple switch and two way switch.
- Power points with ground connection inside sanitaries, kitchen and lounges
(french standard).
- TV and phone outlets.
- Electrical ordinary bell for each apartment.
- The whole electrical instalation will be certified by the french national
electricity company.
- A plan of the electricity of the apartment will be provided at the time
of the signature of the payment.
SANITARIES
The installation will consist in placing and connecting the equipment
such as :
- Bathtube or shower (measurements according to the plan).
- Basin- sink fenced and decorated by natural wood.
- WC pan, flush and double flap.
- Chromium plated taps system.
- Water heater of 200 liters, for a 2 rooms apartment or 300 liters for
a bigger one.
- VMC collective controlled mechanical ventilation.
HEATING
- Electrical heating composed of manual regulating convectors in every
rooms, and selfregulating off freazing ground heating.
INSIDE WALLS COATING
Bathroom (2 choices) :
- Wall tiles in a earthenware type stted up around equipments (15*20 or
20*20, high 1.60 m) under the choice of the purchaser.
- Brushed roughcast on wall with onlt earthenware tiles around the shower.
Kitchen :
- No indicate earthenware.
GLAZIERY
- Thermal insulating panes used for windows, windows frames and glass
doors.
TILING AND FLOORING
- Set down of foor tiles (30*30) ove, soundprooflating concrete screed
inside lounges ,hall wc , bathroom and the doors.
- Set down of wooden floor inside the rooms (depending on samples).
- Entrance and landing with tiles.
KITCHEN CORNER
- Not arranged, without elements.
- Electricity according to the wishes of customers.
- Hot and cold water and draining off.
|